Skip to content
For commercial landlords, asset managers and operators

Let your office space faster with

connectivity already installed

Fibre Force pre-installs gigabit fibre into your multi-let office building at our cost.
With our network partner Meter, your building is internet-ready, network-ready and Wi-Fi-ready before the first viewing.
Which means the connectivity question is answered in the brochure, and the conversation at the viewing stays on the lease.
33
+
buildings made internet-ready
1400000
+
sq ft connected
0
£
landlord capital outlay

Trusted by Landlords and Property Managers Across the UK
Metrus
Global Holdings
Cluttons
St Anselm
CIT Group
Northwoord Investors
UIC-logo
UOL-Group

A key advantage for our buildings

"The installation of backbone fibre has been a key advantage for our buildings. Having high-quality internet infrastructure pre-installed has significantly improved the attractiveness and lettability of the units and has been an important factor for both existing and prospective tenants."

Marco O.
Director, Private Client

They took the pain away

"Dealing with wayleaves is draining, but Austin made it simple and efficient, making me wish all processes were this smooth. Without him, progressing Internet matters would be so time consuming."

Richard Miles
Richard Miles
Director, Metrus

Quick and hassle free

"We’ve been incredibly impressed... Not only is the fibre extremely reliable, but the installation process was quick and hassle free. But what really sets them apart is their personal approach to customer service. They genuinely go above and beyond to ensure everything operates smoothly."

High Faith
Hugh Faith
Property Director, St Anselm

Office space doesn't sit empty because of the market. It sits empty because tenants can't picture moving in.

You've probably experienced this. A few good viewings, all stalled on the same question: "Is there internet connectivity here?" The next few weeks consist of getting ISP quotes, lead-time worries, wrangling over deferred rent, and the deal loses a bit of momentum every week it isn't signed.

 

Voids that stretch into months

Every week an office space sits empty equates to lost rent that you can't claw back. And it's costing you too iff you've gone beyond the empty rates relief period.

The connectivity question is asked much earlier on

Which means the connectivity question is answered in the brochure, and the conversation at the viewing stays on the lease.

A modern building should just work

94% of the decision makers said connectivity is now as essential to their business as water, gas or electricity.

What tenants say they want

81%
would choose a space with connectivity already installed over one without
93%
face an upfront cost to set up networking when they move
1 in 4
had their internet fully working by their lease start date
89%
say poor connectivity would stop them renewing

Source: WiredScore, Fit for Lease 2026 (Opinium, 600 senior decision makers, June 2026). The research relates to the North American market, so treat the percentages as a guide for the UK.

 

How it works

Four steps. Zero capital cost to you

01 
Free building survey

We walk your building, map every floor, and design a fibre connectivity plan that fits around how it lets.

02 
We pre-install, at our cost

Our engineer teams install carrier-grade fibre connectivity and, where agreed, a managed network (including switches, managed firewalls and Wi-Fi access points) to every floor. You don't pay for the work or the equipment. You don't manage the contractors.

03 
Connected from day one

Every floor has gigabit fibre. Tenants can add a managed network and Wi-Fi on a monthly subscription, with nothing to buy upfront.

04 
Ongoing management

We monitor and manage it from then on. If something needs attention, it's on us to sort.

Two leasing conversations.

Only one of them ends in a signed lease.

no pre-installed connectivity

"We'll need to look into the internet situation and come back to you"

  • the tenant asks about connectivity at the end of the viewing
  • you promise to come back with options, and a fortnight passes
  • the ISP quotes a 12-24 week lead time for a new fibre install
  • the tenant views other buildings in the meantime
  • the deal slows down, or doesn't close at all
With fibre force

"There's gigabit fibre to every floor, and you can be working on day one."

  • the brochure leads on "internet-ready, network-ready, Wi-Fi-ready"
  • the connectivity question is answered before the viewing
  • the tenant confirmed the speed they need with us directly
  • the conversation at the viewing stays on the lease
  • a shorter void period, which means rent starts sooner
 
recent work

Buildings we've made

internet-ready.

22 Upper Ground

22 Upper Ground - London SE1

Upper Ground is a 40,000 sq. ft office building that forms part of the iconic Sea Containers development. Positioned on the South West elevation of the property the property benefits from unrivalled views towards the River Thames and Waterloo.
155 Commercial St

155 Commercial St - London E1

An impressive collection of three office buildings surrounding a private courtyard, all in the heart of a trendy City Fringe area near Shoreditch High Street and Liverpool Street station.
60 Sloane Avenue

60 Sloane Avenue - London SW3

110,000 sq. ft. of modern office, and retail accommodation in the heart of Chelsea.
who we are

A small team who got tired of watching good buildings lose good tenants

Fibre Force is a small team of technology people who kept seeing the same thing: well-located, well-finished office space losing tenants over what is, in effect, the building's connectivity plumbing.

So we started putting the plumbing in first.

"The earlier a tenant can see they'll have working internet, the quicker they decide. And the quicker they decide, the sooner you're earning rent."

Austin Awadzi
Co-founder, Fibre Force
PXL_20231204_153649601.PORTRAIT

Not Sure It's Right For Your Building?

It isn't right for every building

It's probably not the right fit if your building is under about 3,000 sq ft, your occupiers are small businesses where standard broadband is genuinely enough, or you already have a provider doing a good job of all three layers. That said, speak to us anyway as a workaround may b e possible.

The Fully Connected office building.

A short, plain-English PDF on how pre-installed fibre, network and Wi-Fi shortens voids and keeps tenant happy at renewal. No fluff.

Ready to make your building fully connected?

Book a free building survey. No cost, no obligation. You see the design and the numbers before you decide anything.