When connectivity comes up in a commercial viewing, the conversation usually goes in one of two directions. Either the building has an answer...or it doesn't, and the landlord promises to come back with options.
What happens next in the second scenario is almost always the same. The landlord contacts an ISP. The ISP conducts a survey. A quote arrives, followed by a timeline. And that timeline, typically 12 to 24 weeks for a new commercial fibre installation, brings the deal to a grinding halt.
Twelve to twenty-four weeks is a long time. It's long enough for a motivated tenant to look at three or more other buildings. Long enough for a business that needs to move to decide it can't wait. Long enough for a deal that felt close to simply evaporate.
This post explains the standard ISP timeline, why it takes that long, and how the Fibre Force model, where fibre is pre-installed before any tenant arrives, removes the timeline problem entirely.
A new commercial fibre installation from an ISP involves several stages, each with its own lead time:
When you add these stages together, 12 weeks is an optimistic timeline. 24 weeks for a complex route or where wayleave issues arise is entirely normal. The tenant knows this. And so, increasingly do their solicitors, who sometimes build it into heads of terms as a landlord obligation.
The Fibre Force model inverts the problem entirely. Rather than installing connectivity when a tenant commits, fibre is installed before any tenant arrives, making it a feature of the building, not a project triggered by a lease.
The average Fibre Force implementation runs like this:
From first conversation to a building where every unit is connected: six weeks on average.
The difference between a 12–24 week ISP timeline and a 6-week Fibre Force implementation isn't just a matter of speed. It's the difference between connectivity being a problem tenants discover and connectivity being a feature landlords lead with.
Most implementations run close to six weeks. The main factors that can extend the timeline are:
We'll give you a realistic timeline at the survey stage, based on what we find. We don't promise six weeks and then surprise you with twelve. The survey exists precisely to identify any factors that affect the plan.
If your building doesn't have pre-installed connectivity, the relevant timeline isn't how long a future installation would take. It's how long your building will continue to lose prospective tenants to the connectivity question while you consider your options.
Every month that passes is another month of viewings where the question comes up and the answer isn't good enough. Another month of deals that could have closed but didn't. The six weeks to implement a solution is, in that context, a very short investment.
If you'd like to find out how quickly we can get your building, contact us today to request a free building survey.