Skip to content

From first survey to

fully connected

within weeks

Pre-installing fibre and Wi-Fi across a multi-let office building used to take months, need a lot of landlord input, and cost £40,000-£80,000+ per building.
We've turned it into a project that typically takes six to eight weeks from survey, at zero capital cost to you.
the timeline

Four steps. Zero capital cost to you

Building survey

STEP 1

Free building survey

We walk your building, map every floor and check what's already there: which ISPs have equipment on site, what's in the comms room, and the current cable routes. Then we design a plan that covers every unit, around the tenant mix you're targeting.

Managed installation

STEP 2

Managed installation

We agree the wayleave, bring fibre in from the street and run it to every floor. Where agreed, Meter installs the network and Wi-Fi alongside us. We coordinate everything through your facilities contact.

Internet-ready from day one

STEP 3

Fully connected from day one

Every unit has access to gigabit fibre. Tenants can add a fully managed network and Wi-Fi, priced per square foot on a monthly subscription. Which means a new tenant moves in, plugs in and is operational from day one.

Ongoing management

STEP 4

Ongoing management

We monitor and manage the infrastructure from then on, so you don't have to. If anything needs attention, it's on us to sort, proactively.

what we supply. and what we need from you

What Fibre Force supplies. And what we need from you.

Fibre Force Supplies

  • all design and survey work
  • wayleave coordination
  • ISP connectivity into the building
  • all in-building fibre and backbone cabling
  • internal data cabling with each demise, where required
  • managed firewalls, switches and Wi-Fi hardware & software
  • 24/7 monitoring and an SLA
  • marketing assistance for your leasing agents

You Supply

  • floor plans, general arrangement drawings, etc.
  • access to the roof, risers, common parts and tenant demises
  • a named contact for access, such as your building or facilities manager
  • an introduction to your asset management team and leasing agents

FAQs

How disruptive is the install for tenants in situ?

Minimal. We sequence noisy work for evenings and weekends, run cabling through risers and ceiling voids, and coordinate with your facilities team in advance. Most tenants don't realise we're there.

 

What if the building changes hands mid-install?

Our agreement transfers with the building. The new owner inherits a fully installed, fully managed connectivity solution.

Can we offer Guest Wi-Fi in the common parts using your solution?

Yes. In partnership with Meter, we can provide enterprise-grade Wi-Fi throughout your common parts (reception, corridors, and breakout areas) on a simple monthly fee. Meter's hardware is Meter-built and fully managed, with proactive hardware refresh included. Your tenants experience seamless connectivity from the moment they walk through the door.

Who is Meter and how do they fit into this?

Meter is our network partner. They provide Network as a Service (enterprise switches, managed firewall, and Wi-Fi access points) as a fully managed monthly subscription priced per square foot. There is no capital outlay for hardware. Meter designs, installs, and manages the network layer that sits on top of the fibre backbone. Together we deliver a building that is internet-ready, network-ready, and Wi-Fi-ready.

Do occupiers have to use Meter?

No. Tenants are free to arrange their own network and Wi-Fi infrastructure. Most choose not to because the simplicity of a fully managed solution with no capital outlay, no hardware to buy, and no IT team required is hard to beat. For tenants who already own networking equipment, Meter's buyback programme gives them credit for existing hardware against the monthly subscription.


Ready to get started?

Book a free building survey. No cost, no obligation.